An inspection lot was created automaticaly during GR. However, the inspection lot is not released, as the specification is not yet assigned. Status of the inspection lot: CRTD CHCR SPRQ
The key date is current date in the inspection specification tape of QA02.
As I tried assigning that by clicking on Task list/spec. I got the message: No inspection plan could be found.
Meantime, the key date changed to an old date (2008), on which the revision level of the material was changed. I changed the key date to the current date, it changed automaticaly back to the same old date.
It worked well before March 2011. I can not find any changes sine that date.
I checked all necessary settings:
1) QM View of the material master inspect with Task List is enabled, automatic Assignment is enabled.
2) Task List exists for the Material ( QP03) and if the Task List Usage is the same as assigned in the Inspection lot.
3) The status of the tast list is released.
4) The lot size of the inspection lot is within the range of From to Lot Size for the inspection plan
5) Task list valid date to 9999
6) No changes ware incorporated after creation of the inspection lot.
7) The basic unit of measurement of the material and inspection plan matches.
8) The task list was created before the revision date.
Your help will be highly appreciated.