Quantcast
Channel: SCN : All Content - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2873

DMR at char. level for all materials assigned to the Insp. Plan

$
0
0

Hi all,

 

We're using a DMR at characteristic level (only for 2 characteristics in a inspection plan of 4) that allows enter results at the very first inspectioin lot created each day per material.

 

It's working fine pear each material, but we would like to have is the skip status would be set to all materials assigned to that inspection plan.

 

I mean, if A and B materials are assigned to this inspection plan and we create the following inspection lots, the system works in this way:

 

Material - Lot - Skip status

 

A - L1 -  Not Activated (Results must entered)

A - L2 - Activated (Results cannot be entered)

B - L3 - Not Activated (Results must entered)

 

and we would like to have is:

 

Material - Lot - Skip status

 

A - L1 -  Not Activated (Results must entered)

A - L2 - Activated (Results cannot be entered)

B - L3 - Activated (Results cannot be entered)

 

So at the end we want to enter results one time per day in some specific inspection characteristics of all materials assigned to the same insp. plan.

 

Can this be achieved?

 

Thanks upfront


Viewing all articles
Browse latest Browse all 2873

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>