Hello all,
Please find below my issue and my request :
SAP ECC6
Aim: Create several QM batch for the same goods entry
Assumption: I create a PO for a quantity of 1000. My material is expected to be controlled and has got a QM view
Why do I want this ? : the target is the possibility to release the goods entries (goods mouvement quality inspection > unrestricted used) units as soon as the material is controlled (i.e. gradually) and not wait that the control of the whole sample is finished, in order not to penalize the assembly of finished products at the end of assembly line (finished products manufactured with semi-finished products controlled in QM)
My issue : When doing my MIGO, the system creates a unique QM batch for inspection and the quantity of my batch equals the quantity of the goods entries
For my case, goods entries = 1000, hence my QM batch + 1000
What I want: if for instance goods entries = 1000, I want for instance 10 batchs of 100 quantities created
What I have to do in the customizing to divide the goods entries in differents batch ?
Thank you very much for your ideas, suggestions or solutions !
Best regards
Vincent