Dear QM Experts,
Scenario is,
1. Material master created with QM view activation.
2. The Base Unit of Measure kept as EA
3. Inspection plan prepared for material with usage 5 and status 4.
4. Material has not undergone any purchase order / production order / routing or any other transactions except inspection plan.
5. No movements have done and the stock is zero
6. The requirement is to change Base Unit of Measure from EA to KG
When tried through MM02 system throws an error message as The base unit of measure cannot be changed; choose "Display errors" Message no. M3189
When viewed through log another information gets displayed as Routings already exist that are assigned to the material. Task list type Q.
I tried through trial and error method. First material assignment was deleted from task list, problem did not resolve. Thereafter deletion flag put to task list. No impact. At last entire task list deleted. Still system does not allow changing unit.
Has anybody faced the same problem ever? Whether deletion of task list (By T-Code QSR6) from data base will server the purpose? What are the obligations that one must follow while execution QSR6?
Or if there is any other solution to this requirement?
Thanks in advance
Best Regards,
Anand Rao