Hi experts,
We need to figure out the scenario where manufacturing requires components inspection when production order is released..
We don't want to consume components before triggering inspection lot, because for my concern (and I think from a logical process flow) components have to be inspected to avoid their inclusion in the production.
By using inspection type 02, we have to consume components on the production order before triggering inspection lot. This is not what we want.
Thanks in advance for your help.