Dear All,
I have an issue in Quality Info Record function. I have 3 vendors for the same material, 3 QIR were created for these.
- The first one, release until next year.
- The second one, release util date was exceed (on 3 days ago).
- The 3rd one, release until next year, but release quantity is exceed.
Default control key 0007 is set for the relevant material
Message mode = Warning is set for control key 0007 in SPRO
Block Procurement Order is set for all 3 QIR.
When I am attempting to create POs for vendor 2 and vendor 3, PO is created successfully with a warning message. (my expectation is PO block)
Then I try to reset Message mode of control key 0007 to Error in SPRO.
After that, I can't create PO for all 3 vendor. Error message "Procurement of material block for quality reason) (My expectation is PO can be created successfully for vendor 1 as this vendor's release date has not yet been exceed).
Please see attached screen shots for more details.
Can anyone help me with this?
Thank you very much.
Yongqi.