Hi,
This is regarding QM in procurement.
I have a requirement, where client inspects raw materials over a period of time and has to move the material from quality stock to unrestricted stock over a period of time, (say 1 month).
As per my understanding and the configurations done by me, after GR an inspection lot is generated. This inspection lot has the quantity copied from GR, say the quantity is 100pc.
Today I want to do result recording for 10pc and move to unrestricted stock.
Next day, i want to result recording for another 10pc. and so on.
Can I accomplish this with single inspection lot generated from the GR.
Thanks.