Quantcast
Channel: SCN : All Content - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2873

Post to inspection tick does not work for Inspection type 08 and mvt 322

$
0
0

Hello Experts,

 

I discovered in my system that independent of Tick for "Post to inspection" for Inspection type 08, system posts stock to Quality Inspection and creates Inspection Lot after 322 movement.

 

For Inspection type 01 it works correctly, in case of missing tick, stock is posted to Unrestricted and Inspection Lot is created.

 

Is it designed way of work? Could it be some enhancement in our system?

In SAP help it is written:

 

"The indicator only has an effect when an inspection lot is created at the time of goods receipt"

 

So if it is designed only for Goods receipts, why it exists for Inspection type 08?

 

Best regards,

Jerzy


Viewing all articles
Browse latest Browse all 2873

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>