Dear Guru's,
I have a issue in Scheduling in Stability Studies. I am fessing a error at the time of scheduling.
When we scheduled a Batch for Stability, One Package has short come, like if system date (current date) is 20.06.2016, than if i starts stability on
06.06.2016 (15 days interval from date of current date and stability start date) and scheduling period is 36 months, than system scheduled only for 24 months. and than if i starts stability on 05.06.2016 (16 days interval from date of current date and stability start date) than it has OK, system scheduled for 36 months.
pl. explain where is the problem