A confirmation process contains three operations. I have assigned MIC to second and third operations and inspection type 3 is activated. When a production order is released and confirmation is done, I get inspection lots.
I want to know how to manage these inspection lots in terms of UD status.
- If I reject an inspection lot, what would happen?
- Can I control the confirmation on the basis of inspection lot valuation?
- If UD is rejected for second operation, can third operation be controlled?
- If second operation UD is not done, can we prevent third operation confirmation?
Please help