Hi,
My scenario is that i want to have a 2 punch system for GRN in the plant where 1st punch is for QC. I am receiving material in the plant through STO or PO. in both these i have selected GR through inbound delivery in the confirmations tab. the inbound delivery type is EL in spro i have assigned 01 origin to EL and activated 01 insp type in the MM. When i create the inbound for STO, system is properly generating the inspection lot for the inbound quantity and then when i do the UD it allows me to do the GRN against inbound in MIGO.
My problem is that when i create inbound against PO in vl31n, the system, is blocking the changes in the inbound but the inspection lot is not getting created. How do i create the inspection lot aginst the inbound quantity?
Thanks,
Ariel