Hi all,
Z8 inspection type created (copying 08) and for the same material we have used std. STO inspection type 08.
we have created Z09 movement type (copying 309 movement type). we have done 311 movement type(insp. type 08 activated )
For a material we have activated both 08 and Z8 inspection type, I have not done any preferred inspection type in the material master
parallelly I have created task list z5 usage for z8 inspection type and 05 usage for 08 insp. type.
now my requirement is to pick z5 usage quality plan for z09 movement type + z8 inspection type combination
already system is picking 05 usage quality plan for 311 movement type + 08 inspection type combination
how to bridge this gap ?
thanks and regards
SARAVANAKUMAR. P