Quantcast
Channel: SCN : All Content - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2873

Dynamic Rule at Charateristic Level

$
0
0

Experts,

 

If I use "Dynamic mod. at Char. Level", and DMR in place. Is there a way that if the nspection plan includes diffrent characteristics,

 

Char. A should be skipped at every second lot

Char. B should be skipped at every tenth lot

 

that SAP allows diffrent skip sequence per Char. in one inspection plan, or place the diffrent DMR on Char. Level?

 

Thanks in advance

Jörg


Viewing all articles
Browse latest Browse all 2873

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>