dear all
if status maintenance order ILNC (inspection lot not created) after released.
1. check configuration order type vs inspection type (14)
SPRO path : IMG > Plant Maintenance and Customer Service> Maintenance and Service Processing>Maintenance and Service Orders> Functions and Settings for Order Types > Assign Inspection Types to Maintenance/Service Order Types
2. check inspection point 300 (inspection point for equipment) in QM data - Task List Header
3. check task list already assigned to maintenance plan and status task list is released
4. check sampling procedure - inspection points already ticked "Plant Maintenance"
last , if you think all setup is OK, check:
5. if you was upgraded for basis release 6.20, see the sap note : 572103 - No inspection lot for maintenance order
(cek this link)
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361706E6F7465735F6E756D6265723D35373231303326
Symptom
No inspection lot is generated for the maintenance order. Status I0182 ILNC 'Inspection lot not
created' is assigned to the order.
In the release log, the system generates message CO548 'Material &1: automatic generation of
inspection lot failed'
Reason and Prerequisites
The units of measurement Customizing was changed for Basis Release 6.20. Instead of the old ISO code
PCE, new ISO code C62 is now used for 'piece(s)'.
As a result, there is no longer any unit of measurement in the standard Customizing which has ISO
code PCE. During inspection lot creation, it is therefore not possible to determine any unit of
measurement for the inspection lot.
![17-02-2015 12-55-40.jpg]()
Solution
Maintain an unit of measurement with ISO code PCE:
Customizing -> General Settings -> Check units of measurement tcode CUNI
Pushbutton 'Units of measurement', selection '(no dimensions)'
Choose an appropriate unit of measurement such as ST or PC or create a new unit of measurement.
Maintain ISO code PCE on the detail screen.
6. After you configure ISO code, check and test. The maintenance order will generate inspection lot after released.
7. If you have maintenance order with status REL ILNC before, don't worry, you still can generate inspection lot but manually.
Go to the Change Maintenance order, then select Order in toolbars , select function --> inspection lot --> create inspection lot. Then the maintenance order will generate inspection lot.