Hi Experts,
I need a help in understanding a point. Below is the situation I am working with -
a) DMR setup is active at UD level (And not at inspection lot creation)
b) "3 Dynamic Modification at Char. Level" is selected at routing header level and at operation => Characteristic level, DMR is selected.
c) Inspection Point 100 is used for creating multiple inspection points for recording results.
If this is really possible to update Q-Level after MIC status is "5" (closed ==> be it Accept or Reject)? If so, how to achieve it.
Is it possible to achieve the above requested functionality by implementing enhancement QEEM0006, user exit EXIT_SAPLQEEM_006 or FM: QDBU_QUALITY_LEVEL_POSTING. Or, there is any other means possible to achieve it?
Also please let me know what all the potential drawback or issues may happen if we try to fix this requirement.
Many thanks in advance for your guidance and help.
Thanks,
Arijit